City of Lancaster Revitalization and Improvement Zone Authority Meeting
3:30 pm
Lancaster Chamber Building
The City of Lancaster is planning to construct two large diameter water transmission main projects: Phase 2 Finished Water Transmission Main and Phase 3 Raw Water Transmission Main. The projects are located in Columbia Borough, West Hempfield Township, and Mountville Borough. The City is preparing an environmental report on the impacts of the construction. The projects include multiple stream crossings, and limited portions of work will be located in floodplains or wetlands.
The City will host a virtual public meeting on July 9, 2025, from 7:00 PM to 8:00 PM to review the environmental impacts of the projects.
The meeting will be streamed on the City’s YouTube channel at www.youtube.com/@CityofLancasterPAGov.
Back to Calendar